Phone: +49 2452 962 0 Mon - Thu: 8:00am – 5:30pm
Friday: 8:00am - 5:00pm (CET)

TROTEC work tent used for cable layings

Work tent at cable layings

Work tent at cable layings

This is a short article about the practical use of our work tents.
In Heinsberg the work tent 180×250 KE was used for cable layings. But there was a problem: the hole was larger than the work tent. Nevertheless the work tent could be fixed safe by means of nylon ropes. Therefore the back of the work tent was placed on the edge of the hole. The work tent didn’t have any other contact to the ground and so it was floating.

Safe fixing of a work tent

Safe fixing of a work tent

Easy access to the cables was possible because of this advantage and all cables could be reached for necessary works.

Due to the many possibilities for fixing the work tent it is flexibly usable.

This entry was posted in TROTEC, Construction Area and tagged . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *


*

  • Discover more …

  • Archives

Top Keywords for http://www.trotec-blog.com/en/trotec/work-tent-at-pit-works/